久久99久久精品国产香蕉直播,亚洲成年人网址,日韩经典在线观看,正在播放久久,成人国产精品156免费观看,在线观看成年人免费视频,久久伊人91

汾陽科士達(dá)精密代理商

品牌: 科士達(dá)
型號: 全型號
產(chǎn)地: 深圳
單價(jià): 16458.00元/臺
發(fā)貨期限: 自買家付款之日起 天內(nèi)發(fā)貨
所在地: 山東 濟(jì)南
有效期至: 長期有效
發(fā)布時間: 2023-12-16 04:15
最后更新: 2023-12-16 04:15
瀏覽次數(shù): 178
采購咨詢:
請賣家聯(lián)系我
發(fā)布企業(yè)資料
詳細(xì)說明

1. Connect the input A, B, C phase fire lines, N lines and PE lines to the user terminals of single POD, mA, mB, mC, mN terminals and PE terminals respectively.
2. Connect the output A, B, C phase firing wires, N and PE wires to the user terminals of POD, oA, oB, oC, oN and PE terminals respectively.
3. Remove all the short copper bars on the input and output terminal rows of UPS. Connect the UPS terminal rows of single POD with the same silk-printed terminals on the input and output terminal rows of UPS, and connect the two PE terminals on the input and output terminal rows of UPS with the PE terminals of single POD.
Installation of UPS Power Supply Host in Costa
1. Verify that all input and output switches outside the Kosta UPS power supply are in the open position.
2. Connect battery cables.
Selective Battery Modules (2)
1. Take out the components of the UPS power supply of Costa, and insert the plugs marked as "Battery Module 1" and "Battery Module 2" into any battery interface on the back panel of the two battery modules.
2. The end of the battery cable marked as UPSPE is grounded close to the ground.
3. Connect one end of the battery cable labeled "BAT+", "BATN", "BAT-" to the "Bat+", "BatN", "Bat-" terminals of the input and output terminals of UPS respectively.
4. Tighten the fixed screw on both sides of the battery interface of the battery module with a screwdriver to prevent the battery cable from loosening or falling off.

相關(guān)科士達(dá)產(chǎn)品
相關(guān)科士達(dá)產(chǎn)品
相關(guān)產(chǎn)品
 
乌海市| 达日县| 洞头县| 横山县| 巴楚县| 五莲县| 邵阳市| 西宁市| 舞阳县| 嵊州市| 临清市| 昌平区| 葵青区| 丰县| 恩平市| 沭阳县| 乌兰察布市| 浑源县| 遵义县| 栖霞市| 休宁县| 伊金霍洛旗| 且末县| 永康市| 资阳市| 略阳县| 保亭| 尼木县| 开原市| 壤塘县| 鄂伦春自治旗| 西丰县| 长葛市| 内乡县| 宜宾市| 葵青区| 台东市| 老河口市| 佛山市| 耒阳市| 平阴县|